0.18–0.24 g/cm³
Energy-return foam
EVA midsole or Phylon stack, density band, named drop (mm). Flex cycling at a stated temperature; compression set recorded, not advertised as unlimited bounce.
This page is the lab ledger for energy-return foam, engineered knit, hydrostatic-head membranes and chassis plates. It is not a forest, carbon-neutral or circular-economy statement.
Each node is a decision a buyer can put on a purchase order. Where a method is still internal, the card says so instead of inventing a percentage.
Road, soccer, tennis and outdoor last families locked for wholesale quoting. Recuts after freeze follow the OEM clock.
Engineered knit courses, denier overlays and collar GSM recorded on the upper map. TPU cage zones named by last family.
Hydrostatic-head testing added for GORE-TEX membrane and PU coating. DWR-only knit stays off the waterproof line.
TPU shank, nylon plate and carbon plate listed as separate chassis tools. Carbon never relabeled as a TPU upgrade.
0.18–0.24 g/cm³
EVA midsole or Phylon stack, density band, named drop (mm). Flex cycling at a stated temperature; compression set recorded, not advertised as unlimited bounce.
TPU / nylon / carbon
TPU shank, nylon plate or carbon plate on a dedicated race last. Bend fixture and stack height. Carbon is a different tool path, not a sticker on a walking last.
Denier + GSM
Engineered knit courses, denier overlays, collar GSM, TPU cage zones. Abrasion and stretch maps. Heat-transfer marks wait until the last freeze.
mm hydrostatic head
GORE-TEX laminate or PU coating with hydrostatic head (mm). Hydrostatic-head test; DWR alone is not listed as waterproof.
FG / AG / indoor
Soccer plates and hiking lugs, including Vibram compound when on the BOM. Durometer and wet/dry notes by activity. Mixing maps is a new construction.
4 / 6 / 8 / 10 mm
Road and court briefs pick from four named drops. Values between two numbers require a new last board, not a ground foam shortcut.
GORE-TEX versus PU coating remains the most common outdoor argument. A laminate breathes and sheds water through a membrane with a millimetre rating. A PU coating is quieter in the rain and changes the hand of the upper. Kappa will not let those two sentences share a hangtag. Carbon plate versus TPU chassis is the racing argument: carbon changes the tool path and the flex; a TPU plate is a different chassis with a different last. Stock-wholesale versus private-label OEM is the commercial argument: a logo does not recut foam tools. FG versus AG stud maps is the soccer argument: mixing them in one SKU is a new plate, not a colorway.
Lab work sits in a materials room with durometers, hydrostatic-head columns and knit abrasion drums. Kappa publishes method names and units. It does not publish unverified “2x energy” claims. If a franchise nickname appears in a buyer brief, the reply translates it into stack, drop, stud map and last family before any colorway is discussed.
Limits that stay on the ledger: energy-return foam is temperature-sensitive, so a 20 °C flex number is not a 35 °C trail number. GORE-TEX membrane pairs still wet out if seam tape is skipped. Carbon-plate race lasts do not transfer to walking or tennis tools. OEM recuts that change drop by more than 2 mm require a new last board. Athletic sandals do not inherit hydrostatic-head language from outdoor boots. Those boundaries are why Kappa asks for activity and destination market before quoting pairs.
Partner names appear only when the BOM names them. A hangtag does not invent a compound.
Listed when the bootie or laminate is in the construction. Hydrostatic head travels with the SKU, not as a brand-wide claim.
Used on outdoor lasts when the compound is tooled. Not every hiking-adjacent last carries this partner outsole.
Scope is the named textile and foam contact pack. It is not a substitute for a hydrostatic-head report.
Process control and social-compliance files for named sites. Attached on the three-day dossier clock.
1
Business day for stock wholesale quotes on a frozen last
5
Business days for OEM last and branding proposals
3
Business days to assemble a compliance dossier
2 mm
Drop change that forces a new last board instead of a foam grind
Send last family, drop, membrane choice, stud or lug map and destination market. The desk returns a construction note, not a lifestyle deck.
Request a capability audit